Anvuur, A M and Kumaraswamy, M M (2007) Conceptual Model of Partnering and Alliancing. Journal of Construction Engineering and Management, 133(03), 225–34.

Jarrah, R, Kulkarni, D and O’Connor, J T (2007) Cash Flow Projections for Selected TxDoT Highway Projects. Journal of Construction Engineering and Management, 133(03), 235–41.

Manrique, J D, Al-Hussein, M, Telyas, A and Funston, G (2007) Case Study-Based Challenges of Quality Concrete Finishing for Architecturally Complex Structures. Journal of Construction Engineering and Management, 133(03), 208–16.

  • Type: Journal Article
  • Keywords: Concrete slabs; Panels; Bonding strength; Concrete, reinforced; Buildings, residential; Connections;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2007)133:3(208)
  • Abstract:
    This paper focuses on the procedure utilized in the construction of tilt-up irregular concrete panels that are constructed on-site using concrete slabs and wooden formwork. The case study required high-quality concrete finishing. The erection and installation procedure called for a maximum panel-to-panel joint tolerance of 1.27 cm (0.5 in.) , often 90° joints between panels. To meet precision requirements, the casting slabs were leveled and flattened with laser screed technology and smoothed with chemical solutions. To ensure that the final result met expectations, a mock-up model was built using different types of materials and to simulate site constraints. The architectural design is a composition of precast concrete panels like “Lego” pieces assembled similarly to a jigsaw puzzle. The unique construction process required a state-of-the-art analysis to produce the set quality. Quality conditions as set by the owner included creating a smooth concrete surface on all panels while avoiding damages and reducing equipment and material costs. The proposed methodology is described through its implementation on the case study, which is also described in this paper.

Manrique, J D, Al-Hussein, M, Telyas, A and Funston, G (2007) Constructing a Complex Precast Tilt-Up-Panel Structure Utilizing an Optimization Model, 3D CAD, and Animation. Journal of Construction Engineering and Management, 133(03), 199–207.

Singh, P, Oh, J E, Labi, S and Sinha, K C (2007) Cost-Effectiveness Evaluation of Warranty Pavement Projects. Journal of Construction Engineering and Management, 133(03), 217–24.

Sturts Dossick, C and Schunk, T K (2007) Subcontractor Schedule Control Method. Journal of Construction Engineering and Management, 133(03), 262–5.

Walsh, K D, Sawhney, A and Bashford, H H (2007) Production Equations for Unsteady-State Construction Processes. Journal of Construction Engineering and Management, 133(03), 254–61.

Yang, Y, Park, C, Kim, J and Kim, J (2007) Management of Daily Progress in a Construction Project of Multiple Apartment Buildings. Journal of Construction Engineering and Management, 133(03), 242–53.